Wasl Tower Expected to be Completed by Second Quarter of 2024

Wasl-Tower-Expected-to-be-Completed-by-Second-Quarter-of-2024

Wasl Tower Expected to be Completed by Second Quarter of 2024

Highlights
- Wasl Tower, which is being built on Sheikh Zayed Road, as received an update from Wasl Asset Management Group.
- Skyscraper is taking shape; when finished, the 302-meter-twisting, the asymmetrical tower will have the tallest ceramic exterior in the area and create the appearance of dynamic motion.

Construction
Wasl Tower will have 64 storeys, 229 residential units, 258 hotel rooms, 185,345 square feet of office space, and 11 parking floors.

Development
- It will be Dubai’s second Mandarin Oriental Hotel.
- A helipad will also be part of the project, which has a built-up area of 1.8 million square feet.
- 56 stories of structural construction are finished, and level 13 of the façade is complete.
- Mechanical, electrical, and plumping works are now at level 52.

Completion
Wasl Tower will be finished in the second quarter of 2024.

Connection
The Burj Khalifa Metro Station, which connects Downtown Dubai and City Walk, will be connected to the tower, which has a direct view of the tower.

Wasl Tower Structure & Design
- Wasl Tower is oriented in practically every direction because of its Z-axis design and traditional “contrapposto” movement.
- Structure stands out in Dubai’s hot summers because of its ability to adjust to local temperatures using shade and cooling measures.